top of page

WHAT TO EXPECT

EXTERIOR

STRUCTURE

Anchor 1

In the report, the inspector must mention

The type of roof.

Roofing material used.

The roof drainage, the roof drain, gutters, downspouts.

Vents, flashing, skylights.

The exterior of chimneys and other roof protrusions.

In the report, the inspector must mention

The material of the exterior wall coverings, the flashing.

The inspector must operate the doors and a representative number of windows.

The terraces, door stoops, staircases, steps, porches, railings, sidewalks, and the parking area.

The eaves, the soffits, and the exterior fascia.

The vegetation, or the surface drainage, and the slope of the land can be harmful to the building.

The support walls are attached to the house.

In the report, the inspector must mention the foundations, floors, beams,columns. and walls.

Roofs.

HEATING

In the report, the inspector must mention

The heating system 

The energy sources.

The type of equipment used to produce heat.

The type and placement of the thermostat.

The exterior of the chimney.

The heat distribution system (ducts, piping, radiators, furnace)

The combustible storage unit (location, date of manufacture, leaks, supports)

The supply line (condition and location)

The refueling pipes and ventilation.

CLIMATE CONTROL

In the report, the inspector must mention

The climate control system 

The type of equipment

The location of the thermostat

 The pipes of the distribution system

The drainage installation.

PLUMBING

 

In the report, the inspector must mention,

Water Supply,visible indoor water distribution system,the supply pipes,

the main supply shut-off valve (type and location),supply piping,

the outdoor taps include vacuum breakers,the system and the indoor taps,the functional flow rate,

and any leakage.

Drainage

The visible indoor system of drainage of wastewater.

The siphons; drainage pipes and vents.

Floor drains.

Anti-backflow systems and cleanouts (placement).

Presence of leaks.

Sump and sump pump.

The presence of yellowish or reddish water in the sumps and catch basin when present.

Solid waste pumps.

Hot water tanks

The equipment supplies hot water.

Tank capacity-Date of manufacture and its location as indicated on the identification plate.

Type of energy.

Presence or absence of

shut-off valve.

Presence or absence of a pressure relief valve (TPR) and drainage tubing

ELECTRICITY

In the report, the inspector must mention

Installation of the power service supply entrance.

Grounding.

Rated amperage and voltage of the equipment as indicated on the fuses and main circuit breaker.

Electrical distribution panels and circuit breakers and fuses.

The wiring of the branch circuit.

The working of a representative number of permanently installed lighting fixtures, switches, and electrical outlets fitted inside and outside of the building.

The polarity and grounding of a representative number of electrical outlets.

The presence or absence of ground fault circuit interrupters.

The working of ground fault circuit interrupters.

The presence or absence of an arch fault circuit breaker

INSULATION

In the report, the inspector must mention

Insulating material and vapor barriers in unfinished and easily accessible spaces.

INTERIOR

In the report, the inspector must mention

The walls, floors, and ceilings.

The staircases, steps, and handrails.

A representative number of windows and doors.

The doors, walls, and ceilings separate the living spaces from the garage.

The presence or absence of smoke detectors.

The presence or absence of carbon monoxide detectors.

Leakage and water stains or noticeable condensation and all signs of mold are noticed inside the building. In this case

VENTILATION

In the report, the inspector must mention

Ventilation of the attic spaces.

Basement and crawl space ventilation.

Mechanical ventilation systems.

Bathroom ventilators.

Range hood.

Dryer evacuation outlet system.

Air exchanger, its filters, location, and air intake

bottom of page